OR Surgery Center Expansion

Our most recently completed project, wrapping up the 2021 year. Coastal IT was fortunate enough to work with HCA, Vannoy Construction, and NetPlanner to complete the Grand Strand Medical Center’s OR surgery building expansion project. This 3,000 sq. ft. addition constituted of 3 new ORs presented a welcome challenge to our team. Grand Strand’s OR surgery center is the only level 1 trauma center in the area. Working in a health care environment presented unique challenges, strict procedures, and high standards. By staying in direct communication with the general contractors and the HCA hospital IT staff throughout the project, we were proud to be able to meet and exceed expectations while staying on schedule and up to speed with the dynamic construction environment. Adhering to the clients needs, our technicians worked through the night in strict sterile conditions to run approximately 130 cables from our new IDF, through the existing surgery center, to their landing in the newly constructed ORs, all without disrupting or compromising hospital operation.

  • Structured Cabling

    • Over 130x Cat6e plenum cables with belden revconnect terminations

      • Wall jacks for data/voice

      • Data to patient monitoring devices

      • Data to Hill Rom nurse call and code blue system

      • Data to Hill Rom ceiling mount boom devices

    • 6x Cat6a plenum cables with 10Gx belden revconnect terminations

    • Full IDF buildout for new construction ORs

      • 4x Belden Network Racks

      • Full surrounding ladder rack/cable tray

      • 4x Belden Recvonnect Patch Panel installation

      • Speaker Cabling and speaker install

    • Backbone Cabling

      • Belden 48 Strand Armored SM Fiber Optic Cable

        • Fusion Spliced to pigtail LC connectors

      • 100 Pair Copper Cat3 terminated to 110 blocks

      • RG-11 Coaxial Cable

Next
Next

One Element Apartment Community